09-01-2023

AE / ANR West, Tangedco, Sir, It is glad to note New 100 KVA Transformer on 7th street of Vallalar colony is commissioned successfully today 09-01-2023 at 16-40 hrs and connected to the ring main circuit. ( Total 3 Transformer capacity 700 KVA, Main transformer 500 KVA, 10th & 7 street each 100 KVA). We take this opportunity for thanking you and entire team who were involved in completing this project.

Regards, Purushothama Naidu, Vice president.

13-12-2022

Electrical Tangedco Grievance Meeting 13-12-2022

On 13-12-2022 around 11AM we have attended Tangedco Grievance meeting at Executive Engineer Office, 11th Main road, Anna Nagar.

We have discussed various issues as listed below. They have agreed to complete all the jobs before end of this December 2022.

  1. Refurbishment of remaining 12 pillar boxes out of total 22 pillar boxes.
  2. Requested for strengthening with additional 120 sq mm cable to avoid frequent power failure in one of the phases.
  3. To restore stand-by power supply to 8th & 9th street from 11th & 6th street. Mr. Sakthivel sir, EE has agreed to release 200 M length of 120 sq mm cable to complete the job.
  4. Restore underground cable on AP 194 on 10th street and AP 217 on 6th street by eliminating temporary over head cables.
  5. Restoration of SWD damaged concrete work on 7th street for about 30 feet length.
  6. Removal of unused 3 nos of concrete poles which are kept at 11th street near the play ground.
  7. Trimming of tree branches inside 500 KVA Transformer yard. 

Purushothama Naidu, Vice president.